Telerobotics Program Plan

3.3 Funding Profile

Overall funding for the Telerobotics Program is established in the annual submission of the NASA budget request to Congress. Input to this funding decision process is gathered from potential users and developers during the development of the annual OSAT technology plan. This plan is an integral part of the annual OACT budget development cycle, and includes input from the NASA field centers and the NASA Headquarters user codes. The planning cycle is illustrated in Figure 3-5.

Breakout of the overall funding level to the individual task elements of the program is determined by the Telerobotics Program Manager. Input to this funding decision process is gathered at the annual spring meeting of the TRIWG, at which program participants present task proposals for the following fiscal year. Following a funding determination by the Telerobotics Program Manager, the planned budget for the next fiscal year is released to the TRIWG and incorporated into the Telerobotics Program Plan. That budget, and that document, is used as the basis for the preparation of annual RTOP documents which detail planned task activities, objectives, schedules, and participants.

When the current tasks being worked in the various elements of the work breakdown structure are completed it is anticipated they will be replaced with other tasks within the same element. The TRIWG will continue to monitor the needs and results in each of the technology elements, and rebalance as appropriate.



Figure 3-5 OSAT Budget Cycle

The Telerobotics Program funding summary by program elements from FY95 through FY99 is shown in the following table. The funds for FY95 are actual expenditures, and those shown for FY96 through FY99 are planned funding levels. The funding is shown by task in the program and organizational element within the Spacecraft Systems Division budget structure (with corresponding Unique Project Numbers, or "UPN"s).

Telerobotics Program Plan Budget - October 1, 1995
UPNTask TitleCenterFY 95 (*)
Actual
FY 96
Plan
FY 97
Plan
FY 98
Plan
FY 99
Plan
233-40-41 Manipulation
1Micro Lander ManipulationJPL$600 $600 $600 $650  
2Calibrated Synthetic ViewingJPL $275 $400   
3SSF Telerobotic MaintenanceJSC$400 $500    
4ISSA Repair & MaintenanceJSC  $1000 $1000 $1500
5RSI Technology TransferJPL$400 $240    
6Ranger Visual InspectionJPL $200 $300   
7Free Flying Camers for EVAUMd/JSC $400 $550 $750 $1000
8Rander Dexterous Arm ControlJPL$350 $300 $300   
9VR for Free Flying RobotsARC$200 $135 $300 $300 $300
10Light, Compact Muscle ActuatorsJPL $214 $175 $180  
11Multiple Autonomous SystemsARC/Stanf$600 $500 $500 $500 $500
12PARISARC $250 $300 $300 $300
13Redundant Robotic SystemsJSC/UT-A$300 $300 $300 $250 $250
14Program ManagementJPL$180 $165 $150 $150 $150
15Program ReserveHQ $60 $500 $500 $500
Subtotal$3030 $4139 $5375 $4580 $4500
233-40-42 Mobility
1VR At Planetary DistancesJPL/ARC $400 $400 $400 $400
2Exploration of Small BodiesJPL$870 $1000 $1000 $750 $750
3Planetary Aerobot MobilityJPL $500 $500 $500  
4Rover Technology (**)JPL/MIT$2150 $1800 $1800 $1500 $1500
5VR for Rover ControlCMU $250 $250   
6Lunar Telescope AssemblyCMU $225 $225 $450 $450
7Lunar Rover TechnologyCMU$380 $500 $500 $500 $750
8Nano-rover Technology JPL $450 $550 $600 $700
9Passive Proximity SensingCMU $250 $250   
Subtotal$3400 $5375 $5475 $4700 $4550
233-40-43 Integrated Systems
1Space OperationsUMd$400 $450 $500 $500 $500
2Robotics Engineering ConsortiumCMU$1000 $500 $1000 $1000 $500
3Micro Telerobotics (RAMS)JPL$600 $500 $800   
4Robot Control ArchitectureCMU $100 $150   
5Remote Scientist (***)JPL $1050 $1200 $1400 $1500
6Lunar Rover DemonstrationCMU$870 $750 $750 $750 $500
7HAZBOT CompletionJPL $100    
8Robotics CommercializationJPL  $1000 $1000 $1500
Subtotal$2870 $3450 $5400 $4650 $4500
233-40-44 Flight Experiments
1Ranger Flight ExperimentUMd$1800 $1925 $1000 $600  
2Ranger Launch Cost DepositHq $800 $2000 $8000  
3Mesur PathfinderJPL$8600 $5800 $2000   
4External Work SystemJSC $3500 $3500 $3000 $3000
Subtotal$10400 $12025 $8500 $11600 $3000
Total$19700 $24989 $24750 $25530 $16550
(*) Does not include ALL FY 95 tasks - only those continued into FY 1996. For a complete list of the FY 1995 program activities, refer to the FY 1995 Telerobotics Program Plan
(**) includes MIT/Brooks - $250K and MIT/Dubowsky - $200K
(***) includes MIT/ Salsbury - $250K


Figure 3-6 Planned Program Budget (Dollars In Thousands)



Please email the site webmaster with any comments, criticisms or corrections for this page.
Maintained by: Dave Lavery
Last updated: February 2, 1996